- Home
- News & Dates
- Our Purpose Built School
Our Purpose Built School
Check out the video and pictures below to get a feel for Cringleford Prep.
Pictures provided by David Kirkham, Fisheye Images.
Our purpose-built school was completed in Summer 2024. It provides high-quality educational facilities, supporting our mission to provide an exceptional education for our pupils. Some of the features of the Cringleford Prep site include:
- Practical lab for science lessons
- Large performance space with drama studio
- On-site kitchen
- Separate, dedicated play area for Early Years
- External hard and soft surfaced outdoor play areas
- Large field
- Library
The new school has two storeys with two classrooms for each year group. There is car parking for staff and visitors, including electric-charging spaces. Its design and layout has been carefully considered to reduce net carbon. The new building has solar panels, air-source heat pumps, natural ventilation and an all-electric kitchen.